great to hear the good vibes,
regarding the train delays, csx was contacted and was asked to delay trains on b-day but this didnt happen this year, maybe next year, we are tryin!
high water
this was addressed and the corp of engineers did the best they could do, but the huricane filled dams upstream (north carolina) to maximum and some water had to be released. the week long rains in wva also caused problems on uncontrolled streams and rivers (greenbriar) in particular. when you see water running out of the side of the mountains, thats a sign that new river will be high.
spectators at the lz,
we felt that some of the energy and heart of bday was lost to limited spectators in lz, the loss of cheers, oohhss and aahhhss were missing, this has been addressed and you may see a change in 2003(hopefully for the best)
there will be some changes in transportation and a larger packing area in 2003.
as a base jumper in my opinion, the cooperation of all of our brothers and sisters in this sport is what made this run smoothly. being polite and courteous to each other and a lot of patience with each other made it all come together.
thanks,
bbird and lz safety crew
ps we found the lost life vest and it will be returned as it was left on the trailer where we set the jumper to dry out and wait for a ride to packing area.
again thanks to all for your cooperation and help in making this a safe b-day
Bookmarks